新闻中心
Current location: Home NewsBusiness management

How to harden the outdoor unpowered equipment amusement park floor?

Number of views:193Publish time:2022/7/22 14:39:28

Children's parks with unpowered play equipment are one of the most popular site attractions, usually located in parks nearby around the community. As a project such as amusement and fitness, many people are familiar with it. In the past few decades, not many people know about unpowered equipment, but in recent years, the development of outdoor sports has gradually become an indispensable part of outdoor venues. More shopping malls, parks, and campuses will have powered or not.

Most of the users of the unpowered amusement park are 3-8-year-old children, at this time, there will be parents worried, their children through climbing equipment, seesaw, slide if they accidentally slip down and fall down? The bare cement on the floor must not leave scars on the child's body. As a professional manufacturer of unpowered equipment, Leto usually does ground hardening for such construction.

Places where play equipment is placed need to be hardened to enhance safety management, whether buried or screwed, need to be solidified by pouring concrete. Only in this way can we better harden EPDM plastic, lawn, floor mat and other materials, which not only makes the safety of children play higher, but also facilitates the overall collocation of amusement equipment.

How to harden the outdoor unpowered equipment amusement park floor? What are the requirements?

1. The surface of the unpowered amusement park needs to be watered through asphalt concrete or cement, and the pouring technology is required to be stable. If cement concrete is used, the base layer needs to be cut, and there is no waterproof layer.

2. It is forbidden to freeze dry the cracks in the foundation or the uneven frost of the site, and there will be frequent irrigation.

3. The base of the amusement equipment needs to have a good flatness and a certain inclination, which is more convenient for hardening.

4. While pouring concrete, it is necessary to ensure that the entire ground is flat, so as to ensure the stable operation of the drainage system.

5. The surface layer of the base should be kept clean and dry at all times, and 21 cycles of maintenance are required after the foundation work of the ground is formally processed.

How to harden the outdoor unpowered equipment amusement park floor? The above is the problem of hardening the amusement park floor explained by Leto Xiaobian for everyone. Why do many manufacturers unanimously recommend hardening? In fact, the most important thing is to ensure the safety of users, ground hardening can be used in different ways such as plastic, lawn, trampoline, etc., and the details can be consulted for Letu Play.

 


Copyright @ Letu Amusement Equipment Co., Ltd. official website 备案号:浙ICP备17042212号-3 XML Sitemaps