新闻中心
Current location: Home NewsIndustry news

What parts of the Rainbow Slide price are included

Number of views:159Publish time:2022/7/22 14:40:00

      The Rainbow Slide is a very popular attraction in recent years, and many people who have invested in this project have had good feedback. For friends who want to join this project, everyone is more concerned about the price of rainbow slides. The level of the price directly affects the cost of our investment, we can choose to join the project, so that the price is more favorable, the general cost can be controlled within 200,000, to see what content is included.

What parts of the Rainbow Slide price are included

A large part of the price of the rainbow slide is the cost of the equipment, and the investment cost of the equipment is the largest, because the rainbow slide is a large amusement project, and a set of equipment contains many components.      There are infrastructure equipment, equipment with slide ramps, and surrounding guardrails, snow rings, etc. These devices are made of high-quality materials, which have the characteristics of good wear resistance, not easy to wear, and good adaptability to the environment. When we select franchise projects, we should compare the material of the equipment, high-quality equipment is the basis for us to choose to join the project, and there is a good set of equipment that can reduce the cost of later operation, which is very cost-effective for investors.

      But the specific time of construction varies greatly. Because the construction site of each rainbow slide is different, the terrain conditions and the surrounding environment are different, and sometimes custom development is required, and the cost of this part of the design is indispensable. The construction of rainbow slides in special terrain requires professional designers to plan in order to ensure the safety of the slides. Rainbow slide price and the cost of slide design, although the rainbow slide style is unified, such as the construction of slides in mountain areas, the construction of slides in scenic spots, the construction of slides by the river, etc., these special places must go through geological exploration, and then carry out the design of slides.

What parts of the Rainbow Slide price are included

      The price of the rainbow slide also includes the installation cost of the equipment, and the construction of the rainbow slide also requires a certain labor cost, which is gradually rising, similar to the decoration of the house, basically half of the cost of the material. The franchise program is a one-time fee, which also includes labor costs. There are professional staff to install and commission the equipment, and the proportion of these costs is also quite large. The slope of the rainbow slide needs to be stitched according to color, and each snowflake should be tightly connected to each other, and the connection to the ground also requires some technical support. In short, the installation of slide equipment is more complicated and the cost is slightly higher.

Related recommendations: Colorful slide operation Dry snow slide precautions Rainbow slide equipment

Copyright @ Letu Amusement Equipment Co., Ltd. official website 备案号:浙ICP备17042212号-3 XML Sitemaps