产品中心

Preparation required for the construction of a playground

The three most needed to do to build a playground are the three quasi.

The three most needed to do to build a playground are the three quasi.

2022-07-22

How to build a good playground is a problem that many friends who are ready to invest in the amusement industry are considering. The children's economy is booming and the amusement market is actively developing, but it is also accompanied by fierce and even white-hot competition. So for an amusement park, be well prepared. Otherwise, once it is put into operation, if the preparation is insufficient, the later business situation will face considerable trouble. In general, the construction of children's playgrounds has three aspects of preparation. First, market research and site selection to do which line to do market research, the market research of children's playgrounds mainly involved in what aspects? For example, the basic situation of the city: population size, consumption scale, structure, traffic conditions, etc., these factors are mostly examined by referring to whether there is a well-run playground in the local area, if there is, it is used as a comparative reference, if not, it is considered for in-depth feasibility; In terms of specific site selection, the atmosphere of the basic indoor and outdoor parks, both need to pay attention to the causes

Copyright @ Letu Amusement Equipment Co., Ltd. official website 备案号:浙ICP备17042212号-3 XML Sitemaps