    In the case of a certain ticket, the increase in consumption level mainly depends on the commercial sales and consumption of catering facilities in the water park area. Secondary consumption in the water park includes the rental of lockers, the purchase of swimwear, swimming rings, water guns and other water toys, and the consumption of food and beverages. In terms of commercial layout, generally in the park entrance area and changing rooms, storage rooms around the configuration of commercial selling points, play area, generally in the playground around the good visual effects set up catering facilities, that is, can be convenient for tourists to stop and watch, but also can increase the stay time, improve the opportunity for food consumption. In terms of product and food development, it is in line with local customs, has uniqueness and theme, and can be better accepted by tourists.

    The planning and design of the water park project can be divided into the following seven stages from the beginning to the construction of the project.

1. Planning

    This was the original source of the project. It is mainly a preliminary reflection on the project, including: upper-level condition analysis, theme positioning, market positioning, site selection, intentional layout mode, basic content planning, etc.

2. Feasibility study

    At this stage, the feasibility of project planning is verified from a technical and economic point of view, including policy research, market analysis, planning plan research, preliminary investment estimation, financial analysis, impact analysis, risk analysis, etc., which is an important part of deciding whether the project is established.

3. Overall planning

    After the site selection is determined, the overall layout and arrangement of time and space of the base are carried out. At this stage, the scope of land use, land use indicators, building requirements, supporting facilities, etc. should be clarified.

4. Concept design

    After the project is settled, the specific design work is officially put into place. Landing theme story, architectural style, layout, moving line setting, water amusement project configuration, business, service, management facility configuration.

5. Scheme design

    Continue the conceptual design stage, comprehensively carry out various design work, and carry out special designs for architecture, exterior, interior, landscape, lighting, and electrical.

6. Expansion design

    On the basis of the scheme design, clarify the façade, size, color, etc., and mark the details.

7. Construction drawings

    All design results are implemented into the construction documents for construction bidding and later construction guidance.